This project involved the removal of an aging filter bed and the installation of a new Eljen GSF treatment system. After safely decommissioning the existing bed, we completed trenching for the new system layout, placed the tank, and backfilled the entire system to Ontario Building Code standards. The work improved overall system performance and prepared the site for long-term use.
This septic replacement was completed at a residential property in Kingston. By upgrading to an Eljen GSF system, the property owner gained a modern, low-impact treatment solution designed for better performance and easier maintenance over time.